1
/
of
5
CYDD
LY 042 S-Curved Chenille Sectional Sofa Dual-Depth 21.3 & 26.8 White No Assembly Compact For Small Spaces 400 Lbs 66.9 L
LY 042 S-Curved Chenille Sectional Sofa Dual-Depth 21.3 & 26.8 White No Assembly Compact For Small Spaces 400 Lbs 66.9 L
Regular price
$451.04 USD
Regular price
$586.35 USD
Sale price
$451.04 USD
Taxes included.
Shipping calculated at checkout.
Quantity
Couldn't load pickup availability
Specification
Product Information
Item Code:W2231P329713
Product Type :Single Box Product
Product Name:LY-042 S-Curved Chenille Sectional Sofa: Dual-Depth (21.3" & 26.8"), White, No Assembly, Compact for Small Spaces, 400 lbs, 66.9" L
Place of Origin:China
Main Color:White
Main Material:Chenille
Filler:Foam
Product Style:American Design,Casual,Chinese
Use Case:Bedroom
Arm Style:Flared Arms
Back Style:Pillow Back
Seats:2 Seat
Seat Plushness:Medium-Soft
Product Dimensions
Assembled Length (in.):66.90
Assembled Width (in.):40.20
Assembled Height (in.):25.60
Product Weight (lbs.):51.90
Package Size
Length (in.):20.90
Width (in.):20.90
Height (in.):37.41
Weight (lbs.):68.07
Product Features
- Tai Chi Inspired Design: Two S-curved sofas combine to form a harmonious circle, embodying Yin-Yang balance while offering versatile solo or paired use.
- Compressed & No Assembly: Unpack and decompress effortlessly
- Luxurious Chenille Fabric: Woodgrain-textured chenille upholstery provides exceptional softness and durable elegance.
- Space-Saving Solution: Compact 66.9" L profile fits small apartments, offices, and cafe corners without sacrificing style.
- Includes Throw Pillows: Two coordinating pillows included for added lumbar support and aesthetic cohesion.
- High-Resilience Foam: Engineered cushioning retains shape over time, offering balanced firmness and comfort.
Share
